Author name: David Hagger

Another fine mess

There seems to be a bit of a theme around glue developing. Back around the 12th LBH made a mess with PVA, ending up with what looked like a Christmas cake. My effort on Monday was smaller and easier to clean but much smellier. (I was attempting to stick some cassettes together)

NBR brake van kit, partially built
The GBV has some wheels now but the bearings are so stiff it really is a brake van.
Here are the real brakes. The safety loops are needed next.

Another fine mess Read More »

Brake Progress

Away from the clubrooms Mr C pressed on with the ADR brake van, adding detail to the ends. Then the internal partitions were completed with doors and handles.

The two L shaped sections were the tried together to complete the box and the alignment was very good. After soldering together the partitions were slide down in place and fitted after a little trimming. The body is pretty rigid and square.

Brake Progress Read More »

It’s hut work

The newly applied timbers to the back of the hut needed staining to represent the preservative applied. Once that wall was done the others needed further stain too so they blended in.

The resin hut just needs the window fitted. It took longer to find the glazing than to clean up and prime the framing. It can be fitted next session, and then perhaps a bit more colour on the brickwork at the back.

It’s hut work Read More »

Quiz Night

Tuesday was a regular Zoom session which featured the second Quiz of the festive season. Quizmaster StephenB teased us with Welsh based questions requiring a bit of in-depth knowledge of minor railway locomotives – which I sadly lacked. The final question – current TfW stations with a k in them – was also taxing. (there are 18 of them).

Quiz Night Read More »

Scroll to Top