More Progress
Starting on Monday and Andrew N delivered the turnout and track for the colliery built away from the clubrooms. It has suitably dirty sleepers and prototypical variations in the quality of the trackwork. This should be manageable as only 4 wheeled wagons and small shunting locos will operate here.
The two views are down from the screens to the exchange sidings, and in the reverse direction.
Also present on Monday was the Peak class diesel, just completed by the Welsh Wizard, Fred Lewis from a kit of ancient lineage.



Moving to Tuesday and Luke’s railcar re-appears, now with a tarpaulin fitted over the open goods compartment.
In the layout room the mock-up of the colliery has moved on with the level ground created and walling arranged. We are approaching the atmosphere of a narrow valley with river and railway crammed in the bottom.
Finally some adjustments to Ty’n-y-Coedcae have created the space for a crane in the goods yard, with a fence being moved and a plinth built for the crane.



At the end of Friday the turnout for Cwm Carno has progressed with the crossing in place and the curved stock rail too.
On Ty’n’Coedcae the plinth for the crane has a surface and first coat of paint and is seen roughly in the right position. Also the front of the layout has a fresh coat of paint ready for the NEWGOG show next Saturday.


