ADR Wagons

Lundi/Montag

Wagonman unveiled a Fulgurex HOm Aigle-Sépey-Diablerets Swiss railcar (if that’s an acceptable translation of Automotrice and Triebwagen). The prototypes were built in 1913 by SWS and AEG and the model, in brass and steel is an absolute delight and the flush glazing a tour-de-force.

LBH continued with the suspension units on one of the ADR two-plank wagons, fixing the bases with epoxy and using a Poppy Axle Spacing jig to get the axles parallel. He also managed to fix the wandering leaf springs before the glue cured.

Paul🥇called in on his way to work, Andrew N decided how to hide the visible turnout operating mechanisms on Frecclesham (see 26th Feb post) and Andrew J applied undercoat to the sides of the rails on Lyne Road.

Lundi/Montag Read More »

Friday 23rd February

A quietish Friday with cleaning underway on Frecclesham .

With the scenic side of Tŷ’n-y-Coedcae largely attended to and the baseboards disassembled while Frecclesham is readied for its trip to Ally Pally LBH reverted to type and went back to building wagons. This time he is trying the Prickley Pear wagon springing units for some ADR two-plank wagons. The solebars on the wagons will need to be eased slightly to allow the rocking units to move.

Another visitor to Frecclesham was Luke’s Dapol Terrier. This also ran successfully and tested the now adjusted turnouts. Luke also was busy removing accumulated dust from the surfaces with a trusty brush and vacuum. Hopefully you can see the difference it makes in the last picture where the darker area below the ground signal has been swept clean.

Friday 23rd February Read More »

Scroll to Top