New Years Day

Only two were in attendance, Mr Chairman and LBH, both working on Tŷ’n-y-Coedcae. MrC on ballasting and the control panel and LBH on scenics.

In the foreground we can see where MrC is ballasting, but it’s more difficult to pick out where LBH is adding wire (actually elastic filament) to the further fence.

The old Pol Sands control panel has to be moved to a new box. As you can see from the shot of the rear the buttons will unscrew but 15mm holes will be needed in the new box. The largest drill available was 10mm so the crude use of a reamer took that up to 12mm, then the even cruder file work got 15mm – ish holes. The finished result is below, though the lines need to be drawn in properly.

New Years Day Read More »