Author name: Rodney Hall

Almost Easter

Monday saw a quiet afternoon meeting, the Wizard painting the stonework for Tŷ’n-y-Coedcae’s goods shed, LBH on barrels and cable drums and Mr C on Cwmcarno track work.

More around on Tuesday, The Wizard and LBH carrying on much as before. Mike E bringing a collection on Fuchsia cuttings to act as pit props on Cwmcarno; The specification being
1” diameter per 1 ft of prop. Pit props were cut to 7, 8, and 9 ft lengths, and cut to shorter lengths underground. TAFKATYS, Luke and Wagonman discussed chassis construction, particularly in respect of Luke’s Railbus and S7 0-4-0 tank.

Luke has also completed a water column for Cwmcarno, seen here posing with its big brother on Tŷ’n-y-Coedcae, the different colouring reflecting the variation in south Wales sandstone with red predominating further south.

Our resident Wizard completed the repaint of the Goods Shed for TyCc.

Also from Luke were some very welcome homemade Hot Cross Buns.

Friday was more trackwork from Luke and Mr C. For the project we had been donated two common crossings (1 in 6) and three V’s for the four turnouts in bullhead track. So two more common crossings are needed. So Mr C made a quick jig by mixing up some Milliput and pressing the made-up crossing into it to form a template. You can see before and after pics below. The first resulting crossing looks good and checks out with the gauges.

LBH has been working on a few bits and pieces to populate Tý’n-y-Coedcae.

Almost Easter Read More »

Back to the club

The adventure to Ally Pally over we turned our attention back to Cwm Carno

TAFKATYS made a set of card mock-ups of the main colliery buildings to enable us to assess how they would fit into the layout topography and affect sight lines.

Meanwhile, back in the workroom, Luke has started on one of the points for Cwmcarno. The sleepers and timbers are cut to length and by the end of the session all were in place using double sided tape. Then there will be a bit of soldering to be done.

Continuing on Friday with the trackwork, more etched chairs were folded up by Mr C. After cutting off the fret they are folded with forceps, then finally shaped against the blocks with a screwdriver. Meanwhile Luke was soldering some into place.

For the control panel TAFKATYS tried out wiring and programming coloured LEDs to indicate the position of the points on the track diagram. This was successful so now the rest of the LEDs need wiring in.

Back to the club Read More »

One pic Monday and many pics Tuesday

Again very little to show Paul 🏅🏅finished the bracing on Cwm Carno’s trackbed, LBH tried and failed to get the BPRC for ADR No 14 working, Andrew J kept going on his signal box interior and here we see Mr Chairman fitting the gutters onto the terrace in ABB.

This Tuesday we meet on Zoom on the day that was the 58th anniversary of the last day of operation on the Cambrian Coast Express and Stephen B showed us a collection of images the day’s operation, Luke shared an idea for hand signals to assist in layout operation, Mr Chairman shared a collection of images with the emphasis on 9Fs (or should it Class 9s?) and LBH came to the end of his series of Welsh scenes.

One pic Monday and many pics Tuesday Read More »

No pic Friday

Enough going on at the club this evening but nothing to precipitate the action of a camera shutter. There was a run through of the ABB timetable with a different combination of operators, TAFKATYS wired the control panel while Paul 🏅🏅 assembled the frame for the pelmet, both for Cwm Carno, the Wizard identified castings and LBH assembled a loom for the battery-power radio-control of ADR No 14.

Well, actually we did get one pic of how things were on Friday. This shows the progress TAFKATYS made on the Cwm Carno panel.

No pic Friday Read More »

Cwm Carno gets a night off.

Attention went elsewhere this evening.

Mr Chairman exhumed his ex-GWR mogul from the vaults, and once our Wizard had sorted out a catching pick-up, it performed well enough be a back-up for the Hall and 2800 on ABB at Ally Pally. He then went about fitting Dingham couplings.

Wagonman fitted a few more bits-and-bobs onto his ex-CMDPLR pannier, which will now await fairer weather before she can be painted.

Also from Wagonman we had the latest view of progress on his ex-SR U Mogul

And LBH whiled the evening away assembling a TVR three-plank wagon from 3d-printolutions.

Cwm Carno wasn’t entirely ignored, Wagonman looked at some of the wagons he had built for LMJ and thought they might be suitable for Cwm Carno, though not all the same time obviously!

Cwm Carno gets a night off. Read More »

Preparations for Ally Pally etc.

With Abergavenny Blackbrook‘s visit to the London Festival of Railway Modelling at Alexandra Palace, London, which is now only three weeks away much of the evening’s efforts was in practicing operation on ABB.

Other works progressed though, with Luke turning his attentions from the body of his 0-4-0T to its chassis. A write-up of Luke’s build can be found in the Scaleseven Group website here.

Friday also saw TAFKATYS arrive with the planned control panel for Cwm Carno. After discussion the uncoupling magnet positions are settled and by Sunday it’s been completed.

Preparations for Ally Pally etc. Read More »

Cwm Carno trackbed and ABB uncouplers

Work continued on the trackbed on Cwm Carno, which is now fixed in place.

When we got the framework laser cut, thanks to TAFKATYS’s prescience, we also got a set of alignment gauges made to check the we had the correct elevation difference and that we hadn’t introduced a warp into the trackbed.

Elsewhere we worked on reviving and old Mainline pannier tank, uniting an elderly brass chassis with a modern Bachmann body. The chassis will need a bit of TLC and the body a bit of detailing and weathering but it should provide a useful loco for Cwm Carno.

Mr Chairman sorted out a problem that we had with one of the servo motors that move the uncoupling magnets on ABB. It was working in the wrong sense, that is normally in the up/uncoupling position, this was sorted out by swapping over the blue and orange cables inside the control box.

Cwm Carno trackbed and ABB uncouplers Read More »

Monday 17th February

Monday and the usual activities in the workroom, etched kits to the fore in Rhobat’s and the Wizard’s hands, while in the layout room work progressed on the Cwm Carno baseboard.

The river bed is the lowest, central strip of plywood.

We first gave attention the river bed, square wooden blocks screwed and glued to the vertical risers and the river bed for our version of Nant Carno.

Blocks have been fixed in place too for the trackbed, but it is seen here just placed in situ.

Forming the weir in Nant Carno.

Monday 17th February Read More »

Week ending 16th February

Monday saw five of us at at the club.

Continuing the etched brass tank engine meme from last week, Rhobat, with the helpful Wizard’s eye, is also essaying his first loco, in this case a Hunslet Jazzer kit in OO from the CSP range.

Meanwhile LBH converted a B&MR PBV to S7. Now it needs some serious weathering!

Tuesday evening we largely concentrated on runs-through of the ABB table honing a few items here and there. Wagonman continued to work on his ex-CM&DP pannier tank, the Wizard on a diesel (a Peak perhaps), and LBH on a gearbox for a 2-4-0T.

Friday and the next job to do on Cwm Carno was to cut the plywood for the track- and river beds. The initial idea was to extract the positions of the edges on the trackbed at 150 mm intervals from the drawing below.

That approach wasn’t welcomed by the club carpenter, Paul S!

Instead, we had already obtained a full-size print of the layout drawing for planning purposes, so we drilled small holes through it to plywood below marking the borders of the beds. Then by ‘joining up the dots’ we were able to use a jigsaw to the correct outline. Here we see the river bed in place, but not yet fixed.

And here’s the trackbed placed on the frame. The top of the picture is the top of the valley with, from the left, ‘mainline’, headshunt and colliery screens.

There are adjustments to make at the entry and exit points.

Meanwhile in the workroom a small parade of locos was assembled.; two pannier tanks and two 56xx’s. From left to right we have the Ditton Priors tank that’s featured before, two 4mm scale tanks from Mike E’s stable (which ran much better after the wheels had been thoroughly cleaned) and a brand new Minerva Models 7mm 56xx. This last belongs to Ed who in true Newport fashion has his feet in both the 4mm and 7mm camps.

Week ending 16th February Read More »