Week ending 09 Nov

This Monday preparation started for the platform on Cwm Carno. The support blocks for the platform face have been stuck in place carefully positioned using the modified track gauge. (Its been readjusted after use) The platform facing itself is ready along with the station building off-scene, and a test coach is waiting.

Tuesday evening was a zoom session. We had a little more on the Clee Hill, even more on the Cambrian from Steve B, 4-4-0s and 0-4-4s from Mr. C, and varied scenes from LBH including Lydney Harbour, some Col Stephens and lesser-known country lines.

On Friday someone sensible decided to check the platform clearances for an outside cylinder loco. The clearance is 1mm, which could be close. We don’t intend to run a 28xx normally but its a good test engine. Also the workman’s train was posed in the station to check its appearance.

At the Missenden Modellers’ weekend Mr C tackled the chassis for his S7 Taff Vale V class. Progress was made though crank pins didn’t get fitted to test the coupling rods.

Scroll to Top