Then on Friday the electrical connection to the exchange sidings was made allowing test running and a check on the sector plate operation. Some stock was tested too along with the colliery trackwork. Some track needed reglueing which is under the weight in the second picture. Also Wagonman gave his Cl 25 an outing.

