Monday saw a quiet afternoon meeting, the Wizard painting the stonework for Tŷ’n-y-Coedcae’s goods shed, LBH on barrels and cable drums and Mr C on Cwmcarno track work.
More around on Tuesday, The Wizard and LBH carrying on much as before. Mike E bringing a collection on Fuchsia cuttings to act as pit props on Cwmcarno; The specification being
1” diameter per 1 ft of prop. Pit props were cut to 7, 8, and 9 ft lengths, and cut to shorter lengths underground. TAFKATYS, Luke and Wagonman discussed chassis construction, particularly in respect of Luke’s Railbus and S7 0-4-0 tank.
Luke has also completed a water column for Cwmcarno, seen here posing with its big brother on Tŷ’n-y-Coedcae, the different colouring reflecting the variation in south Wales sandstone with red predominating further south.


Our resident Wizard completed the repaint of the Goods Shed for TyCc.
Also from Luke were some very welcome homemade Hot Cross Buns.
Friday was more trackwork from Luke and Mr C. For the project we had been donated two common crossings (1 in 6) and three V’s for the four turnouts in bullhead track. So two more common crossings are needed. So Mr C made a quick jig by mixing up some Milliput and pressing the made-up crossing into it to form a template. You can see before and after pics below. The first resulting crossing looks good and checks out with the gauges.




LBH has been working on a few bits and pieces to populate Tý’n-y-Coedcae.