Enough going on at the club this evening but nothing to precipitate the action of a camera shutter. There was a run through of the ABB timetable with a different combination of operators, TAFKATYS wired the control panel while Paul 🏅🏅 assembled the frame for the pelmet, both for Cwm Carno, the Wizard identified castings and LBH assembled a loom for the battery-power radio-control of ADR No 14.
Well, actually we did get one pic of how things were on Friday. This shows the progress TAFKATYS made on the Cwm Carno panel.
