Work continued on the trackbed on Cwm Carno, which is now fixed in place.

When we got the framework laser cut, thanks to TAFKATYS’s prescience, we also got a set of alignment gauges made to check the we had the correct elevation difference and that we hadn’t introduced a warp into the trackbed.


Elsewhere we worked on reviving and old Mainline pannier tank, uniting an elderly brass chassis with a modern Bachmann body. The chassis will need a bit of TLC and the body a bit of detailing and weathering but it should provide a useful loco for Cwm Carno.
Mr Chairman sorted out a problem that we had with one of the servo motors that move the uncoupling magnets on ABB. It was working in the wrong sense, that is normally in the up/uncoupling position, this was sorted out by swapping over the blue and orange cables inside the control box.