Week ending 18 August 2024

The Dog Days of 2024 are upon us and things are a tad quiet at the club before we do into a jam-packed Autumn with the club being involved in four exhibitions plus an Open Day – put a note of 10 November in your diaries.

Rhobat and Fred are working together to produce a satisfactory bunker on Rhobat’s BR Class J. The first step is to create a mock-up using the rough cut pieces shown here.

Tuesday and Luke’s shunting plank has been erected on the new legs. After a bit of electrical soldering work we did some trial running.

Also the fence in front of the semis on ABB has been fixed with ground built up around it.

Friday and preparation of ABB continues. While the track and cassettes were being cleaned, the loco roster were in for wheel cleaning. Selecting 1954 as the time period does mean there are a lot of black engines and the picture is a bit reminiscent of Barry scrapyard.

Meanwhile Wagonman is preparing some GWR 9ft coach bogies in 7mm scale. The four of them are supposed to be identical. However, the pairs come from two different manufacturers and in the closer shot you can see that there are differences.

LBH rolled the second boiler for the B&MR Class 36. In the horizontal view you can see one of three temporary straps that were put in place while the internal gusset, seen in the end view, was soldered in place.

Scroll to Top