Monday and the quest for a Barry Class G continues with a Midland 0-4-4T as another possible candidate. You can make a comparison between the two in the picture.
For more info on Barry stock look here.
Work has resumed on some fencing for in front of the semis on ABB. The view in the pic is from the back. The fencing has been attached to the front brickwork and brass wire glued in to help locate the assembly in position.
Tuesday and the inner face of brickwork now has been trimmed to match the step down in the fence and then stuck on. Some primer next, then attempt to install it.
Luke has had the privilege of wielding Thor’s hammer to persuade the T nuts into these wooden blocks. They are to take the adjustable feet for a set of legs. Then he used it again to get the blocks into the ends of the legs themselves. The modified legs are the further set. With a little adjustment the baseboard was level.
With ABB set to go to Scaleforum as soon as next month, it was time to get it erected in the layout room. Of course we chose the bit where the floor is not completely level so some packing was required.