Black LMS locos

A possible solution to the short circuits on the 42xx may have been found. The split axle in the gearbox needs to critically be the right way around. The picture shows it in the correct orientation, which it wasn’t previously.

With a P4 new proposal being mooted for the Jubilee Challenge, some of the track components from LMJ have been unearthed. The templates are B8s whereas we are thinking about B6s.

Two LMS locos have recently emerged from Wagonman’s paintshop. The Coal Tank represents the final one that was at Abergavenny. The 2P is for the Upton on Severn branch. It is (fortunately) not visible in the photo but the lining on the boiler bands and elsewhere has crinkled.

Scroll to Top